Ride-through

For a large computing load: staying connected to the grid through a normally cleared voltage sag, then restoring its load, instead of transferring to backup. ERCOT NOGRR282 and SPP's large-load rules are in force; NERC's CLO standards passed final ballot.

Context: Parts 1.2, 3.2, 4.2, 4.3, 4.4, 4.8, 4.10, 11.10, 12.1, 13.6, 13.10, 14.8, 14.11, 14.13, 16.1, 16.3, 16.5, A, E, F, G

In other contexts, Ride-through also means Carrying a load through a brief power dip, source transfer or loss of coolant flow on stored energy or thermal margin (BBU, UPS, BESS, coolant inertia). Grid ride-through, staying connected to the grid, is a different requirement (Chapter 4.10)..

Current numbers

10–30 sRide-through time Revterra's comparison table gives for other flywheel UPS productsas of 2026-10-13 · register ↗
400 J/GPUNVIDIA Vera Rubin rack-level energy storage normalized per GPU; vendor-stated power-smoothing envelope, not facility ride-throughas of 2026-03 · register ↗
75 MWERCOT large-load threshold: Large Load Interconnection Study and NOGRR282 ride-through scopeas of 2025-12 · register ↗