real-power injection window of BESS/flywheels — the bridge from the ms GPU step to the genset's seconds-to-minutes ramp
5–30 sobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| As of | 2025 |
| Source | Revterra |
| Review | checking…review by 2026-10-23 · standard cadence |
| Recorded changes | last 2026-07-14 · 3 revisions tracked |
| Claim id | real-power-injection-window-of-bess-flywheels |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.