ERCOT 'large load' threshold forcing full interconnection + protection study (25 MW = modeling)

75 MWobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2026
SourceERCOT Large Load Integration; SB6
Reviewchecking…review by 2026-10-31 · standard cadence
Recorded changeslast 2026-06-29
Claim idercot-large-load-threshold-forcing-full