FERC · Federal Energy Regulatory Commission

The US agency regulating interstate electricity transmission, wholesale markets and grid interconnection rules.

Current numbers

≥50 MW @ ≥100 kVCLO/CLOP registry threshold (NERC Board-approved 2026-10-08; FERC pending): total connected site load ≥50 MW, through equipment at ≥100 kVas of 2026-10-08 · register ↗
Project 2026-02NERC computational-load standards project: CLO/CLOP functions, CLO-001/002/003 Board-adopted 2026-10-26, FERC filing due 2026-12-31as of 2026-10-26 · register ↗
>20 MW (DOE-proposed)DOE-proposed large-load threshold in FERC RM26-4 (not adopted); §206 show-cause cases opened against six RTOs/ISOs 18 Jun 2026as of 2026-08 · register ↗