Proposed CLO/CLOP registry criteria: a Computational Load Site with total connected load ≥50 MW supplied through equipment connected at ≥100 kV, from one or more points of connection, registers its owner as Computational Load Owner and its operator as Computational Load Operator (NERC second-round posting 2026-08-19; approved by NERC's Board 2026-10-08, pending FERC)
≥50 MW @ ≥100 kVproposed
| Value kind | proposed — Proposed values are not yet final requirements or specifications; track the decision or rulemaking that can change them. |
|---|---|
| Scope | Rules of Procedure Appendix 5B criteria posted 2026-08-19 (comments closed 2026-09-18) and approved by NERC's Board on 2026-10-08; site aggregation across one or more points of connection. Not effective until FERC approves NERC's filing under FERC's 2026-07-16 order in Docket RD26-7-000. The Project 2026-02 standards use the same ≥50 MW / ≥100 kV site threshold (CLO-001-1 §4.2.1). |
| As of | 2026-10-08 |
| Source | NERC, proposed Rules of Procedure Appendices 2/5A/5B (Computational Load Owner/Operator registry criteria), second-round posting 2026-08-19; Steptoe analysis · Appendix 5B redline: Computational Load Site of at least 50 MW total connected load supplied at ≥100 kV; CLO/CLOP definitions in Appendix 2 |
| Review | checking…review by 2027-01-15 · standard cadence |
| Recorded changes | last 2026-10-17 · 4 revisions tracked |
| Claim id | proposed-cle-bright-line-1-mw-it-load-within-20 |