LARS · Large Load Addition Resource Study
MISO's proposed study that would take a load over 200 MW and new generation in the same zone through one 120-day study, if the pair stays together for at least 15 years. Filed at FERC on October 2, 2026; pending, not a rule.
Context: Parts 3.2