MW · Megawatt
Unit of real power; in AI data centers it has become the de facto unit of compute capacity and grid demand.
Current numbers
72.5% of a 50 MW contractAEP Ohio Schedule DCT post-ramp tier floor, 50 MW contract: 15 MW plus 85% of capacity above 25 MW
About 91 MVA per unit; select above the exact boundillustrative per-unit minimum for 150 MW facility demand, N−1, 0.95 PF, 0.95 site factor and 10% margin
$45,000/MW-year (assumed)assumed availability offer for a bounded 5 MW dispatch right