NOGRR282
ERCOT's ride-through rule for Large Computational Loads (75 MW+, mostly power-electronic), in effect since 2026-08-01. Loads must stay connected through defined sags and restore 90% of load within 2 s; earlier loads are exempt.
Also written as: NOGRR 282
Current numbers
75 MWERCOT large-load threshold: Large Load Interconnection Study and NOGRR282 ride-through scope