Max P

An OEM's maximum-performance operating profile, the top of a system's power range; it sizes breakers, busway and transients. Pegatron rates Vera Rubin NVL72 at 228 kW Max P; NVIDIA's DSX design basis is 330 kW.

Also written as: Max-P

Current numbers

188 kW (Max Q) / 228 kW (Max P)Vera Rubin NVL72: 188 kW Max Q, 228 kW Max P (Pegatron); 330 kW cabinet TDP design basis (NVIDIA DSX)as of 2026-08 · register ↗