The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Busway

Busway

Overhead enclosed busbar run with tap-off boxes that distributes power flexibly across rows of racks.

Current numbers

800–1,000 Aoverhead busway ampacity AI halls now spec (vs legacy 400 A); named product lines top out at 1,000 A (Eaton PowerWave 2: 250–1,000 A)as of 2025-09 · register ↗

← All terms