Pegatron RA4803-72N3 Vera Rubin NVL72 rack power — 188 kW (Max Q) / 228 kW (Max P) OEM TDP support; both above GB300 NVL72 (135 kW TDP / 155 kW peak). Size a hall position from the facility design basis, not from either operating profile

188 kW (Max Q) / 228 kW (Max P)observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeOperating profiles from Pegatron's RA4803-72N3 datasheet, which also ships 4 × 110 kW power shelves. NVIDIA's own Vera Rubin datasheet (October 2026) rates 187 kW MaxQ / 227 kW MaxP. Distinct from the facility design basis: NVIDIA's DSX Facilities Infrastructure Design Guide v2.0 (2026-08-19) provisions a 330 kW cabinet TDP for Vera Rubin NVL72. Size substrate, busway, pipe and CDU from the design basis; run energy and TCO models on Max Q / Max P.
CaveatTrendForce (2026-06-25) independently put VR200 rack draw at ~225 kW, inside the OEM Max Q–Max P band. NVIDIA publishes no rack-power figure on the product page.
As of2026-08
SourcePegatron RA4803-72N3 datasheet
Reviewchecking…review by 2026-11-28 · standard cadence
Recorded changeslast 2026-08-31 · 4 revisions tracked
Claim idvera-rubin-nvl72-rack-power-max-q-max-p