Rubin

NVIDIA's GPU architecture generation following Blackwell, with Rubin Ultra pushing rack-scale density further.

Also written as: VR200

Current numbers

~600 kWper Rubin Ultra Kyber-class rack: roadmap, announced and not shipping; do not budget it as a shipping figureas of H2 2027 roadmap (GTC 2025); 2028 reported July 2026 · register ↗
2.3 kW TDP support per Rubin GPU (Pegatron)Pegatron's published TDP for each Rubin GPU in its RA4803-72N3 rack; an OEM rating, not measured drawas of 2026-10 · register ↗
3.0 TB/sNVLink 6 per-GPU bandwidth (Vera Rubin, shipping spec); 900 GB/s Hopper, 1.8 TB/s Blackwell — ~216 TB/s per NVL72 rackas of 2026-09 · register ↗