Vera Rubin GPU package power — ~1.8 kW at Max Q / 2.3 kW at Max P
~1.8 kW Max Q / 2.3 kW Max Pderived
| Value kind | derived — Derived values are guide calculations; their result is only as fixed as the stated inputs, scope, and method. |
|---|---|
| Scope | The same dual-die Rubin GPU package has two operating profiles; neither figure is a Rubin Ultra TDP. Rubin Ultra per-package TDP is not published. |
| As of | 2026-08 |
| Source | Pegatron RA4803-72N3 datasheet and product page · RA4803-72N3 product page: GPU 4 x NVIDIA Rubin GPUs, 2300W TDP; Pegatron datasheet: Max Q 188 kW / Max P 228 kW |
| Review | checking…review by 2026-08-05 · standard cadence |
| Recorded changes | last 2026-08-31 · 3 revisions tracked |
| Claim id | projected-rubin-ultra-per-gpu-tdp-a100-was-0-3 |