The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Scale-up

Scale-up

Tightly coupling GPUs into one coherent high-bandwidth domain (NVLink class) that acts like a single large accelerator.

Current numbers

~18x (GB200, 400G) / ~9x (GB300, 800G) / ~7.5x (Vera Rubin, 1.6T)scale-up versus back-end scale-out peak bandwidth per GPU: roughly 8-18x per direction by generationas of 2026-10-05 · register ↗
HGX 8; NVL72 72; Rubin Ultra NVL576 576/8 racks; Kyber NVL144 144/rack, NVL1152 1,152/8 racksscale-up (NVLink) domain size: HGX node, NVL72 rack, announced Rubin Ultra and Kyberas of 2026 · register ↗
~18× GB200 / ~9× GB300NVLink 5 per-GPU scale-up (~900 GB/s per direction) vs one scale-out NIC per GPU: ~18× GB200/CX-7/400G, ~9× GB300/CX-8/800Gas of 2026 · register ↗

← All terms