ESUN
OCP's Ethernet scale-up network specification (1.0, February 2026): switch-side framing, headers and loss handling for accelerator scale-up over Ethernet. The endpoint transport is the separate SUE-T spec.
Context: Parts 8.1, 8.2, 16.2, A
OCP's Ethernet scale-up network specification (1.0, February 2026): switch-side framing, headers and loss handling for accelerator scale-up over Ethernet. The endpoint transport is the separate SUE-T spec.
Context: Parts 8.1, 8.2, 16.2, A