The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › ICI

ICI · Inter-Chip Interconnect

Google's TPU scale-up link, wiring chips into a torus instead of an all-to-all crossbar, so coherent domain size comes from topology and optical switching rather than a central switch tier.

← All terms