The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › NIC

NIC · Network Interface Card

The server's network adapter. AI nodes carry multiple RDMA-capable high-speed NICs — often one per GPU — as the on-ramp to the scale-out fabric.

Also written as: NICs

Current numbers

~100 ns switch hop; ~1 us cited application examplefabric latency must name its measurement boundary: NVIDIA cites about 100 ns for an InfiniBand switch hop and about 1 microsecond in application-latency examples; NIC-to-NIC and RoCEv2 results are topology, NIC, software and workload specificas of 2026-08-24 · register ↗
131,072GPUs in a two-tier fabric of 512×100G switches with each 800G NIC split into eight 100G planes (MRC consortium design; four-plane 4×200G and eight-plane 8×100G systems deployed)as of 2026-05 · register ↗
~18× GB200 / ~9× GB300NVLink 5 per-GPU scale-up (~900 GB/s per direction) vs one scale-out NIC per GPU: ~18× GB200/CX-7/400G, ~9× GB300/CX-8/800Gas of 2026 · register ↗

← All terms