The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

Per-GPU scale-out bandwidth on the NVIDIA Rubin platform — a per-GPU platform figure delivered as two ConnectX-9 SuperNICs per GPU (each an 800 Gb/s part, the family's first with single-port 800GbE); double the ConnectX-8 generation's 800 Gb/s per GPU

up to 1.6 Tb/sobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
Caveat1.6 Tb/s is the Rubin per-GPU platform bandwidth (2x800G ConnectX-9), not a single-NIC port: the ConnectX-9 hardware manual lists 800 Gb/s SKUs (C9180 single-OSFP, 800GbE-capable). Rubin partner systems 2H 2026.
As of2026
SourceNVIDIA Rubin platform blog + ConnectX-9 SuperNIC User Manual · Rubin platform blog and CES 2026 coverage: 1.6 Tb/s is the per-GPU scale-out figure, delivered as two 800 Gb/s ConnectX-9 SuperNICs per GPU. The ConnectX-9 hardware manual lists 800 Gb/s SKUs (C9180 single-OSFP, 800GbE-capable); NVIDIA's newsroom release names CX-9 but omits a bandwidth figure and the datasheet is cookie-walled.
Reviewchecking…review by 2027-03-06 · fast cadence
Recorded changeslast 2026-08-13 · 2 revisions tracked
Claim idnvidia-connectx-9-supernic-bandwidth-rubin

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.