PHC · PTP Hardware Clock

The clock inside a NIC that a PTP daemon disciplines to the grandmaster and that the host system clock then follows; fleet-wide offset from master is what commissioning must prove.

Current numbers

ptp4l / phc2sys / ts2phcthe linuxptp daemons: distribute IEEE-1588, slave system clock to PHC, steer PHC from GNSS/PPSas of 2025 · register ↗