The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › LPDDR5X

LPDDR5X · low-power double data rate 5X (SDRAM)

Low-power DRAM soldered into coherent CPU-GPU superchip packages; it buys bandwidth and efficiency over socketed DDR5 at the cost of field-serviceability and capacity choice.

Current numbers

88 cores / 1.5 TBNVIDIA Vera CPU: 88 Olympus cores, 176 threads, up to 1.5 TB LPDDR5X @ ~1.2 TB/s, OEM avail. H2 2026as of 2026 · register ↗

← All terms