The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

NVIDIA Vera CPU: 88 Olympus cores, 176 threads, up to 1.5 TB LPDDR5X @ ~1.2 TB/s, OEM avail. H2 2026

88 cores / 1.5 TBobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2026
SourceNVIDIA (Vera CPU) · Key takeaways and memory-subsystem section; 88 Olympus cores, 176 threads, up to 1.5 TB LPDDR5X, approximately 1.2 TB/s bandwidth, and H2 2026 OEM availability are specified.
Reviewchecking…review by 2026-10-18 · standard cadence
Recorded changeslast 2026-06-29
Claim idnvidia-vera-cpu-88-olympus-cores-176-threads-up

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.