The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › CPU

CPU · Central Processing Unit

The host processor in a GPU node: runs the OS, storage and data pipelines, and orchestration while the accelerators do the tensor math; the CPU:GPU ratio is a node-design choice.

Current numbers

100 requests/s; 0.20 CPU-seconds/request; CPU occupancy ceiling 70%; thin host 16 cores; pool 32 cores; 30 active requests × 2.0 GB state; 40 GB runtime reserve; 128 GB host memory; sensitivity 120 requests/s.Size a host pool from CPU service demand — input ledgeras of 2026-09 · register ↗
29 required cores; 100 GB host state. The 32-core pool passes the screen; its CPU ceiling is about 110 requests/s.Size a host pool from CPU service demand — result and flip thresholdas of 2026-09 · register ↗
1.5x vs 3xStorage overhead of erasure coding (EC 4+2) vs triple replication; EC saves capacity but costs CPU, RAM and rebuild loadas of 2026-09 · register ↗

← All terms