B300

NVIDIA's later Blackwell-generation GPU, the memory-expanded step above B200 and a reference point for how per-GPU HBM capacity and rack power are climbing each generation.

Current numbers

80 → 288 GB → ~1 TBHBM capacity per accelerator package: H100 80 GB; HGX B200 180 GB; B300 288 GB (HBM3E); Rubin Ultra ~1 TB HBM4E on a four-chiplet package (roadmap)as of 2026-08 · register ↗
~288 GBHBM4 per Rubin GPU at ~22 TB/s; trajectory H100 80 GB → H200 141 GB → HGX B200 180 GB → B300 288 GB, flat into Rubin, then Rubin Ultra 1 TBas of 2026-07 · register ↗
~8 → ~22 TB/sper-GPU HBM bandwidth, HBM3E (B200/B300 class) → HBM4 (Rubin, 8 stacks) — ~2.8xas of 2026 · register ↗