XDR InfiniBand
NVIDIA's 800 Gb/s-per-port InfiniBand generation (Quantum-X800 switches, ConnectX-8), the GB300 and B300 InfiniBand back end. On Ethernet the same ConnectX-8 port runs as 2×400GbE.
Also written as: XDR
NVIDIA's 800 Gb/s-per-port InfiniBand generation (Quantum-X800 switches, ConnectX-8), the GB300 and B300 InfiniBand back end. On Ethernet the same ConnectX-8 port runs as 2×400GbE.
Also written as: XDR