The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › PFC

PFC · Priority Flow Control

An Ethernet mechanism that pauses traffic to prevent packet loss, making RoCE lossless but risking head-of-line blocking.

Current numbers

May 2026MRC released as an open OCP spec (OpenAI + AMD/Broadcom/Intel/Microsoft/NVIDIA): RoCEv2 extension with per-packet spray, SACK, optional trimming, PFC-off; production-proven at 50k–75k-GPU scale before publicationas of 2026-05 · register ↗
400Gspeed at which Meta ran production RoCE PFC-only on the back-end, leaning on topology over loop tuningas of 2024 · register ↗

← All terms