The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › DCQCN

DCQCN

The congestion-control algorithm tuning RoCE flows using ECN and PFC; mis-tuned it causes victim flows and stalls.

Current numbers

80–90%share of the InfiniBand throughput gap careful DCQCN tuning closes on a 100k H100-class RoCEv2 fabric — analyst estimate, not a portable acceptance targetas of 2025 · register ↗

← All terms