LPO · Linear Pluggable Optics
Pluggable optics with the DSP removed so the host ASIC's SerDes drives the optic directly; it cuts module power sharply but makes you the owner of the entire electrical path and its interop risk.
Current numbers
≤8.5 W800G LPO DR8 module maximum power (FS, September 2025)