The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › DSP

DSP · Digital Signal Processor

In optics: the retimer/equalizer chip inside a pluggable transceiver that recovers the signal — the main power consumer that LPO and CPO designs remove.

Context: Parts 7, 8

Current numbers

~15–17 W800G DSP pluggable module power (DR4 / 2×FR4), SemiAnalysis January 2026as of 2026-01 · register ↗
~30W → ~9WPer-1.6 Tb/s interface power, pluggable DSP vs co-packaged optics — ~3.3× from the rounded endpoints; NVIDIA separately claims 3.5× efficiency and 10× resiliencyas of August 18, 2025 vendor illustration · register ↗

← All terms