The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › LCOE

LCOE · Levelized Cost of Energy

The per-MWh lifetime cost used to rank generation options; on a build gated by time-to-megawatt it is the wrong ranking variable used alone.

← All terms