Interconnection queue
The utility waitlist for connecting new large loads or generation to the grid; multi-year waits dominate AI siting.
Current numbers
>2,060 GWUS generator interconnection queue, active end-2025 (gen + storage; down from ~2,290 GW end-2024)
>2,060 GWUS interconnection queue end-2025 (end-2024: ~2,290 GW = ~1,400 GW gen + ~890 GW storage, ~10,300 projects)
438+ GWERCOT large-load interconnection queue, mid-2026 (~89% data centers; 63→233→438+ GW arc)