The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › FEC

FEC · Forward Error Correction

Encoding that lets the receiver fix transmission errors without retransmission, essential at high link speeds.

Current numbers

224G-class electricalElectrical SerDes class; obtain exact interface signaling and FECas of 2026-02-10 · register ↗
100-200 Gb/sPAM4 SerDes per-lane rate driving 800G/1.6T links — FEC-mandatory, BER-screening-criticalas of 2025 · register ↗
~10 nsPTP accuracy held across an NVIDIA Spectrum switch (one-step, across speeds/FEC)as of 2022-09 · register ↗

← All terms