PTP accuracy held across an NVIDIA Spectrum switch (one-step boundary clock, sustained across link speeds and FEC configurations)

~10 nsobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeEnd-to-end PTP accuracy across the switch. The sub-4 ns figure is the internal Spectrum ASIC synchronization error and ConnectX-class NIC timestamp variance, carried as its own register entry (internal-asic-sync-error-spectrum-and-connectx) — do not read it off this tile.
As of2022-09
SourceNVIDIA Technical Blog, 'Calculating and Synchronizing Time with the Precision Timing Protocol on the NVIDIA Spectrum Switch' (developer.nvidia.com, 2022) · PTP accuracy section; overall accuracy around 10 ns, maintained across all speeds and FEC configurations; ASIC synchronization error below 4 ns
Reviewchecking…review by 2026-11-23 · standard cadence
Recorded changeslast 2026-09-16 · 3 revisions tracked
Claim idptp-accuracy-held-across-a-spectrum-switch