Guide › Glossary › Fat-tree

Fat-tree

A multi-tier leaf/spine-derived network topology with increasing aggregate bandwidth toward the root. Oversubscription, path diversity, routing, link speeds, and failure state determine whether a particular deployment is nonblocking; the topology name alone does not.

Current numbers

144 × 800GQuantum-X800 radix (72 OSFP); 2-tier fat-tree to 10,368 NICs, tens of thousands of GPUs in 3 tiersas of 2025 · register ↗
38-77%paper-modeled rail-only network-cost reduction vs full-bisection fat-treeas of 2024-07 · register ↗