The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › COP

COP · Coefficient of Performance

A heat pump or chiller's ratio of heat moved to electricity consumed; higher means more efficient cooling or heating.

Current numbers

COP ~2.5–6high-temperature heat-pump COP across the lift range; ~4–6 from a warm DLC source, ~2.5–3.5 from low-grade airas of 2025 · register ↗

← All terms