high-temperature heat-pump COP across the lift range; ~4–6 from a warm DLC source, ~2.5–3.5 from low-grade air

COP ~2.5–6observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2025
SourceScienceDirect HT heat-pump DH studies; Energy Solutions review