Behind-the-meter · BTM
On-site generation connected on the customer side of the utility meter, bypassing grid interconnection delays.
Current numbers
~90 GW / 59 projectsplanned US behind-the-meter capacity tracked; ~90% announced in 2025; ~2 GW online mid-2026, 2.8–3.2 GW by year-end
~90 GW announcedbehind-the-meter gas announced cumulatively by mid-2026 (~82 GW of it since Jan 2025); ~2 GW operating
~82 GWbehind-the-meter (mostly gas) announced since Jan 2025; the speed-vs-carbon tradeoff in one number