The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › AALC

AALC · Air-assisted liquid cooling

A named air-assisted liquid-cooling system uses an internal liquid loop and air-side heat rejection without facility water at the rack. Capacity and suitability depend on the named equipment, rack heat split, room airflow/inlet conditions, and facility heat-rejection envelope—not a universal air-cooling ceiling.

← All terms