The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Numbers register › Claim

WUE-site range: industry average ~1.8–1.9; best-in-class evaporation 0.3–0.7; dry, non-evaporative heat rejection ~0

~0-1.9 L/kWhobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeThe near-zero endpoint requires dry, non-evaporative heat rejection; loop closure alone does not determine WUE-site.
As of2025
SourceVertiv / NREL synthesis; Microsoft FY2025 fleet ~0.27
Reviewchecking…review by 2026-09-05 · standard cadence
Recorded changeslast 2026-07-02 · 2 revisions tracked
Claim idwue-range-industry-avg-1-8-1-9-best-in-class-0

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.