WUE-site achievable with warm-water liquid cooling and dry, non-evaporative heat rejection (Microsoft next-gen, >125M L/yr saved/facility)
~0 L/kWhobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Near-zero WUE-site depends on dry, non-evaporative heat rejection; a closed technology-cooling loop alone does not eliminate evaporative make-up water. |
| As of | 2025 |
| Source | Microsoft sustainability reporting |
| Review | checking…review by 2026-11-06 · standard cadence |
| Recorded changes | last 2026-06-29 |
| Claim id | wue-achievable-with-closed-loop-dry-cooled-warm |