Guide › Numbers register › Claim

average annualized PUE reported by respondents to Uptime Institute's 2025 survey (n=681); sixth consecutive broadly flat year

1.54observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeRespondent-survey statistic, not an industry-weighted fleet average. The public claim does not provide a population-weighting method; use it as a dated survey benchmark and retain the sample and survey methodology when comparing it with a named facility or fleet.
Caveat2025 survey figure (n=681). Uptime's 2026 survey (published 2026-07-28; analysed 2026-08-06) reports two separately defined successors: 1.52 as the annual survey average and 1.36 on a capacity-weighted basis — the gap is the larger-facility advantage, not an improvement in the same population. Neither is a measured average of the world fleet. Same 2026 survey: modal installed-base rack density reached 11 kW (from 9 kW in 2025) — the installed base, not the AI-factory design point.
As of2025
SourceUptime Institute Global Data Center Survey 2025
Reviewchecking…review by 2026-12-15 · standard cadence
Recorded changeslast 2026-06-29
Claim idweighted-average-annualized-pue-sixth

Where the guide uses it

← Full numbers register — every date-stamped figure in the guide, with revision history.