wall-clock speedup of variance-controlled async RL vs synchronous at equal accuracy (~42h vs ~105h)
2.5xobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| As of | 2026 |
| Source | Stable Asynchrony / VCPO (arXiv 2602.17616) · Abstract: VCPO achieves up to 2.5x wall-clock speedup while matching synchronous-training accuracy |
| Review | checking…review by 2026-10-31 · standard cadence |
| Recorded changes | last 2026-06-29 |
| Claim id | wall-clock-speedup-of-variance-controlled-async |
Where the guide uses it
← Full numbers register — every date-stamped figure in the guide, with revision history.