volumetric heat capacity of water vs air — the reason liquid operates in a different cooling regime

~3,500×observed

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2025
SourceThermodynamic reference; ASHRAE TC 9.9 · Chapter 13 equations and standard properties: air density 1.20 kg/m³ and specific heat 1.0 kJ/(kg·K), versus water's volumetric heat-carrying properties, giving approximately 3,500x.
Reviewchecking…review by 2026-08-25 · fast cadence
Recorded changeslast 2026-07-21 · 2 revisions tracked
Claim idvolumetric-heat-capacity-of-water-vs-air-the