ProphetStor-reported pump and valve slew limits in its predictive-control description

±3% RPM/min, ≤10% valve/minobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
ScopeSupplier-reported limits, not OCP requirements or a market-wide actuator envelope. The separate integration example uses one Supermicro server with eight H100 GPUs and operator-applied steady-flow recommendations.
CaveatObtain the installed CDU/controller limits and validate the required transient locally.
As of2026
SourceProphetStor, Predictive Liquid Cooling for AI Data Centers, narrative control limits and separate integration-test setup (undated page). · Motivation for Predictive Control and Adaptive Loop Workflow: pump slew limited to ±3% RPM/min and valve travel to no more than 10%/min
Reviewchecking…review by 2026-08-14 · standard cadence
Recorded changeslast 2026-09-16 · 3 revisions tracked
Claim idvendor-typical-cdu-pump-and-valve-slew-limits