uniform live-load basis for liquid-cooled AI halls (vs ~150 psf legacy); column loads >1,000 kips

250–500+ psfobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2025
SourceGeopier; StructureMag; TechTarget · Worked structural-load example calculates approximately 240 psf over the hall and 412.5 psf over the rack footprint
Reviewchecking…review by 2026-08-23 · standard cadence
Recorded changeslast 2026-06-29
Claim iduniform-live-load-basis-for-liquid-cooled-ai