security standoff is threat-, construction-, asset- and controlled-perimeter-dependent and must be determined through a site-specific security and blast assessment

Site-specific security/blast assessmentrecommendation

Value kindrecommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions.
As of2026-08-24
SourceUK National Protective Security Authority · Data-centre physical-perimeter and building risk guidance
Reviewchecking…review by 2026-12-22 · standard cadence
Recorded changeslast 2026-08-24 · 2 revisions tracked
Claim idtypical-standoff-range-a-rural-power-first