typical power-factor obligation at the POI for large transmission-connected loads
unity-0.95 lagobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| As of | 2026 |
| Source | ISO/utility large-load tariffs (synthesis) · Load-connection power-factor requirement: 0.95 lagging to unity |
| Review | checking…review by 2026-10-04 · standard cadence |
| Recorded changes | last 2026-06-29 |
| Claim id | typical-power-factor-obligation-at-the-poi-for |