example published raised-access-floor uniform-load rating; not a concentrated, rolling, or rack-acceptance criterion
~150 lb/ft²observed
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | The ~150 lb/ft² figure is an area-distributed rating in the cited secondary guide. Accept a rack only after comparing OEM foot/wheel reactions, rolling and rigging loads, and project load combinations with the complete panel, pedestal, stringer, slab, and move-route criteria. |
| As of | 2025 |
| Source | AccessFloorStore |
| Review | checking…review by 2026-10-17 · standard cadence |
| Recorded changes | last 2026-07-14 · 3 revisions tracked |
| Claim id | typical-legacy-raised-floor-rating-vs-a-3-000 |