legacy raised-floor examples are not a universal rack acceptance limit; verify the exact panel, pedestal, stringer, assembly, and slab path
manufacturer- and assembly-specificobserved
| Value kind | observed — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range. |
|---|---|
| Scope | Compare OEM static and rolling reactions with like-for-like uniform, concentrated, rolling, and ultimate ratings; qualify any spreader or slab bypass. |
| As of | 2025 |
| Source | AccessFloorStore / DCIM load guides |
| Review | checking…review by 2026-09-02 · standard cadence |
| Recorded changes | last 2026-08-24 · 3 revisions tracked |
| Claim id | typical-legacy-raised-floor-rating-needs-steel |
Where the guide uses it
Not quoted in a chapter yet; it is kept in the curated register.
← Full numbers register — every date-stamped figure in the guide, with revision history.