Type 1 / Class I SPD test waveform (direct-lightning current); Type 2 / Class II uses 8/20 µs

10/350 µsobserved

Value kindobserved — Reported measurements, counts, and specifications keep the precision and scope stated by their source; an exact specification is not treated as a range.
As of2024
SourceIEC 61643-11:2025 (AC SPDs), with common requirements in IEC 61643-01; DC low-voltage SPDs are covered by IEC 61643-41:2025 · SPD classification: IEC 61643-11 Type 1/Class I uses 10/350 µs; Type 2/Class II uses 8/20 µs. IEC 61643-11 remains a live AC-specific standard alongside IEC 61643-01.
Reviewchecking…review by 2026-10-16 · standard cadence
Recorded changeslast 2026-09-04 · 2 revisions tracked
Claim idtype-1-class-i-spd-test-waveform-direct