time from CDU flow loss to throttle, controlled shutdown or trip is product- and implementation-specific; require OEM transient data, commissioning tests or a professional-engineering calculation

OEM/test-specific transientrecommendation

Value kindrecommendation — Recommendations are design guidance, not measured facts; validate them against the project boundary conditions.
ScopeDepends on thermal mass, flow, temperature, workload, controls and firmware; no portable GB200 NVL72 value is retained.
As of2026-08-24
SourceOpen Compute Project, Advanced Cooling Facilities reference-design guidance · Thermal ride-through and loss-of-flow response require declared equipment behavior and engineered validation
Reviewchecking…review by 2026-12-22 · standard cadence
Recorded changeslast 2026-08-24 · 3 revisions tracked
Claim idtime-from-cdu-flow-loss-to-gb200-nvl72-throttle

Where the guide uses it

Not quoted in a chapter yet; it is kept in the curated register.

← Full numbers register — every date-stamped figure in the guide, with revision history.